Jump to content

Build

From Icesus Wiki
Raise buildings, paths and bridges in a province settlement.

Starting work (council members; a home's owner on their own lot).
Plans come from the storehouse's blueprint loft ('list plans').
  build <building>         - on a prepared lot, lay out a building
                             from the plan you carry
  build upgrade            - at a building, with its upgrade plan:
                             what the upgrade will cost
  build upgrade confirm    - start it
  build path               - lay a path on a prepared lot, for wood
                             and silver from the treasury
  build demolish           - take a path up again, no refund
  build bridge <direction> - bridge the water beside you
  build earmark [<type>|clear]
                           - reserve a prepared lot for a building
                             planned later, so no one builds on it

At a building site (Worker standing or better):
  build                    - hammer-work; carry a hammer or mace,
                             and a better one works faster
  build deliver            - draw what the stage needs from the
                             province stores
  deposit <n>|all <goods>  - give your own goods: from your wagon
                             here, else your hands, the ground or
                             a pile you may draw from
  deposit all iron         - your iron bars; steel, silver, gold,
                             platinum and titanium work the same
  wanted                   - what this stage needs, and the next
  progress                 - how far this stage has come

Elsewhere, 'build' says what can be done where you stand.

Each stage needs its hammer-work and its materials. The foreman
inspects on the day of the Creation, the last day of each game
week, and signs off a stage that is ready; one that is not waits
a week. 'time calendar' shows when the day falls. A session cut
short by tiredness, a fight or leaving keeps the work it did, and
hammer-work earns you a little experience. Only what a stage still
lacks is taken; the rest stays with you.

The storehouse must become Advanced before any other building
can. An Advanced upgrade runs twenty stages and also wants metal
bars and a carpenter's work: a scaffolding set, and beams,
trusses, panels or joinery by the building's purpose ('help
designs'). 'build upgrade' lists the whole bill before you
commit. Advanced work waits safely between visits. A council
member can 'abandon' at a site to see what cancelling returns:
the current stage's materials come back, the rest is spent.

Building is artisan work, and a trained hand builds much faster
and wastes less. Construction, designing, craftsmanship,
workmanship, finishing and fine hand coordination help with
everything; masonry and engraving with stone buildings (workshop,
shrine, smeltery); carpentry, timber construction, joinery,
knowledge of wood, wood carving, hewing and sawing with wooden
ones (housing, inn, sawmill, food hall, storehouse); and the
smith's skills with forge work.

Examples:
  build storehouse         - lay out the storehouse from its plan
  build                    - work on the site you stand at
  deposit all stone        - tip a wagonload of blocks into it
  build upgrade            - see what upgrading this building costs
  build bridge west        - bridge the water to the west
  build earmark mine       - keep this lot for a mine

See also: province construction, prepare, repair, gather, wagon,
          designs